You are here

Watershed Protection Plan Development for the Navasota River below Lake Limestone

Project Goals/Objectives: 1) Characterize current bacteria loadings and sources for the watershed 2) Determine needed levels of loading reduction to restore the waterbody 3) Work with watershed stakeholders to select and prioritize management measures needed to restore the waterbody 4) Develop a watershed protection plan for the Navasota River below Lake Limestone

Project Location: Navasota River below Lake Limetsone in Brazos, Grimes, Madison, Leon, Limestone and Robertson Counties

Project Costs: State Funds ($210,532)

Project Participant(s): TSSWCB, Texas Water Resources Institute, Texas AgriLife Research- Department of Soil and Crop Sciences

Project Workplan: 15-50 (PDF, 335 KB)

Project Quality Assurance Project Plan(s): 15-50 (PDF, 985 KB)

Draft Watershed Protection Plan: Navasota WPP (PDF, 3.25 MB)

Project Website: http://navasota.tamu.edu/